Built for Comfort, Efficiency, and Long-Term Performance

Bathroom Remodeling in Ashburn, VA

Bathrooms are some of the most complex rooms in a home. They involve water management, ventilation, inspections, and detailed finish work. At DLA Design & Build, we remodel bathrooms in Ashburn with a focus on durability, comfort, and clean design.

Tell Us About Your Project

Fill out the form below and we will call you back to talk about your project.

Bathroom Remodeling Requires Experience With More Than Just Tile and Fixtures

A successful bathroom remodel depends on proper waterproofing, correct plumbing installation, and careful inspection coordination. We manage every step so problems are solved before they become expensive issues.

What a Full Bathroom Remodel Actually Involves

A real bathroom remodel is a full rebuild. It includes demolition, plumbing and electrical updates, waterproofing, ventilation, tile installation, fixtures, and finishes. We explain each phase so you always know what is happening.

Bathrooms We’ve Rebuilt From the Ground Up

Our bathroom projects include complete tear-outs and rebuilds with modern layouts, walk-in showers, updated vanities, and durable materials. These bathrooms are designed to last, not just look good on day one.

Full Bathroom Renovations

Complete demolition and reconstruction of outdated bathrooms with improved layouts, updated systems, and modern finishes.

Shower and Tub Conversions

Custom walk-in showers, tub-to-shower conversions, and upgraded bathing areas built with proper waterproofing and drainage.

Tile, Vanities, and Fixture Installation

Carefully installed tile, vanities, lighting, and fixtures chosen for durability, comfort, and ease of maintenance.

Plumbing, Electrical, and Ventilation Upgrades

Bathrooms often require system upgrades to meet current codes and performance standards. We handle all required updates properly.

What You Can Expect When We Remodel Your Bathroom

You can expect clear explanations, organized scheduling, and attention to detail. We coordinate inspections, manage trades, and finish with a detailed punch list to ensure everything meets expectations.
GOOGLE REVIEWS

What Our Clients Say

Real feedback from homeowners across Northern Virginia. We're proud of the relationships we build, project by project.

5.0 Average Rating
★★★★★
40+ Five-Star Reviews

Ready to Upgrade a Bathroom Without the Stress?

If your bathroom feels outdated or difficult to use, let’s talk through your goals and timeline. Planning upfront makes all the difference.

The Finished Bathroom Feels Calm, Clean, and Easy to Use

Once complete, the bathroom feels more comfortable, easier to maintain, and better suited to daily routines. It becomes a space you enjoy using instead of one you tolerate.

Frequently Asked Questions About Bathroom Remodeling

A hall or guest bathroom typically takes 3 to 5 weeks once demolition starts. Primary bathrooms with custom tile work, larger showers, and layout changes usually run 5 to 8 weeks. Tile lead time and shower glass fabrication are the most common schedule drivers, not the construction itself.

Yes, both conversions are common. Tub-to-shower conversions let us build a larger shower with a curbless or low-curb entry, a bench, and a linear drain. Shower-to-tub conversions usually involve resizing plumbing and making sure the floor structure supports a filled tub. We handle the waterproofing, tile, glass, and fixtures as one continuous scope.

Yes, this is the default. We bring the plumbers, electricians, and tile setters under one schedule so rough-ins, inspections, and finish work happen in the right order. You have one contract, one point of contact, and one team responsible if anything needs to be adjusted.

Proper waterproofing and ventilation are not optional. Every shower gets a fully waterproofed substrate behind the tile, not just backer board. Exhaust fans are sized to the room and vented to the exterior, never into the attic. If we find existing moisture damage during demolition, we stop, document it, and repair it before closing walls.

Yes, and this is one of the best ways to upgrade a cramped primary bathroom. Taking a few feet from an adjacent closet, bedroom, or hallway can open up room for a double vanity, separate water closet, or larger shower. We handle framing, electrical rework, and any HVAC relocation needed.

Hall and guest bathrooms generally run $25,000 to $50,000. Primary bathrooms with larger showers, double vanities, and better tile work usually land between $50,000 and $120,000. Layout changes, heated floors, and high-end fixtures push the top end higher. We break down every cost so you can decide where to invest.

Start the Conversation About Your Project

Whether you are exploring ideas or ready to move forward, we are here to help you understand your options.

Reach out to schedule a consultation and tell us about your home, your goals, and your timeline. We will walk you through the process and answer your questions honestly.

"*" indicates required fields

* indicates required fields